Golmud-Lhasa Railway (Construction)
Qinghai-Lhasa Railway
Locations
Type
Rail
Status
Completed
Total Reported Cost
56.0 million CNY
Initiatives
Start Date
June 29 2001
Start of Construction
—
Planned Completion Date
July 01 2006
Contractors
- China Railway No.11 Bureau Group Co., Ltd
- China Railway No. 12 Bureau Group Co., Ltd
- China Railway No. 17 Bureau Group Co., Ltd
- China Railway No.13 Bureau Group Co., Ltd
- China Railway No .14 Bureau Group Co., Ltd
- China Railway No. 15 Bureau Group Co., Ltd
- China Railway No.16 Bureau Group Co., Ltd
- China Railway No. 1 Bureau Group Co., Ltd
- China Railway No. 2 Bureau Group Co., Ltd
- China Railway No.3 Bureau Group Co., Ltd
- China Railway No.4 Bureau Group Co., Ltd
- China Railway No. 5 Bureau Group Co., Ltd
Consultants
- —
Implementers
- —
Operators
Funders
| Source(s) | Amount |
|---|
Description
The length of the railway is 1,956 km (1,215 mi). Construction of the 815 km (506 mi) section between Xining and Golmud was completed by 1984. The 1,142 km (710 mi) section between Golmud and Lhasa was inaugurated on 1 July 2006, by Chinese President Hu Jintao. This railway is the first to connect the Tibet Autonomous Region to any other province, which, due to its elevation and terrain, is the last province-level entity in mainland China to have a railway. Passenger trains run from Beijing, Chengdu, Chongqing, Guangzhou, Shanghai, Xining, and Lanzhou.